Magnesium alloy with excellent ignition resistance and mechanical properties, and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822432
SERIAL NO

13511015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnesium alloy that forms a stable protective film on the surface of molten metal, having excellent ignition resistance restricting natural ignition of a chip thereof as well as having excellent strength and ductility, so that the Mg alloy can be melted and cast in the air or a common inert atmosphere. The magnesium alloy includes, by weight, 7.0% or greater but less than 11% of Al, 0.05% to 2.0% of Ca, 0.05% to 2.0% of Y, greater than 0% but not greater than 6.0% of Zn, and the balance of Mg, and the other unavoidable impurities. The total content of the Ca and the Y is equal to or greater than 0.1% but less than 2.5% of the total weight of the magnesium alloy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF MATERIALS SCIENCE(SANGNAM-DONG) 797 CHANGWON-DAERO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51508

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ha Sik Changwon, KR 7 8
Kim, Young Min Changwon, KR 342 1756
Yim, Chang Dong Changwon, KR 6 11
You, Bong Sun Changwon, KR 8 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00