Molded body and method for producing cellulose-nanofiber-containing composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822241
SERIAL NO

15025917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is a cellulose nanofiber that can be easily combined with a compound having a reactive double-bond group and that can provide a molded article which contains only a small amount of an uncured material that acts as a plasticizer in a molded product, using a simple producing method that does not require any process involving solvent displacement or solvent removal. A high-strength resin composition or molded body prepared by using the cellulose nanofiber is also provided. In refining cellulose in the presence of a compound having a reactive double bond and a hydroxyl value of 200 KOHmg/g or more, the cellulose has a moisture content of 4 to 25 parts by mass with respect to 100 parts by mass of the amount of the cellulose converted on the assumption that the percentage moisture of the cellulose is 0%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON PAPER INDUSTRIES CO LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Tetsuya Sakura, JP 34 234
Ikuma, Takahito Sakura, JP 12 24
Kanzaki, Mitsuyuki Takaishi, JP 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00