Polyisocyanate composition, solar cell member covering material, solar cell member with cover layer, microcapsule, and binder for ink

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822212
APP PUB NO 20150183922A1
SERIAL NO

14416525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polyisocyanate composition is produced by reaction of bis(isocyanatomethyl) cyclohexane with trimethylolpropane, and contains a trimethylolpropane-monomolecular-body obtained by reaction of three molecules of bis(isocyanatomethyl) cyclohexane with one molecule of trimethylolpropane, and a trimethylolpropane-bimolecular-body obtained by reaction of five molecules of bis(isocyanatomethyl) cyclohexane with two molecules of trimethylolpropane; and the molar ratio of trimethylolpropane-monomolecular-body relative to trimethylolpropane-bimolecular-body (trimethylolpropane-monomolecular-body/trimethylolpropane-bimolecular-body) contained in the polyisocyanate composition is 1.5 or more and 4.5 or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUI CHEMICALS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanno, Takashi Ichihara, JP 78 546
Matsumoto, Yoshihiro Shizuoka, JP 76 1184
Nakagawa, Toshihiko Ichihara, JP 38 304
Ootsuka, Hideaki Chiba, JP 2 6
Shibata, Tatsuya Ichihara, JP 11 113
Tachibana, Shinji Ichihara, JP 24 153
Uchida, Takashi Chiba, JP 130 1306
Yamasaki, Satoshi Chiba, JP 143 961

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00