Process for the preparation of branched polybutadiene having a high content of 1,4-cis units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822198
APP PUB NO 20150080526A1
SERIAL NO

14388474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the preparation of branched polybutadiene having a high content of 1,4-cis units which comprises polymerizing butadiene in the presence of at least one organic solvent, and in the presence of: a) a catalytic system prepared in situ including: (a1) at least one neodymium carboxylate, (a2) at least one alkyl compound of aluminum, (A3) at least one alkyl compound of aluminum containing at least one halogen atom, and b) at least one organic ester containing at least one halogen atom. Said branched polybutadiene having a high content of 1,4-cis units, depending on the branching degree and molecular weight distribution, can be advantageously used in various applications ranging from the modification of plastic materials [production, for example, of high impact polystyrene (HIPS)] to the production of tires, in particular the production of treads and/or of sidewalls of tires.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSALIS SP APIAZZA BOLDRINI 1 SAN DONATO MILANESE I-20097

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Perretta, Costantino Ferrara, IT 3 3
Vallieri, Andrea Bologna, IT 9 28
Zinna, Marianna Ravenna, IT 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00