Hybrid vehicle engine starts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821798
SERIAL NO

14741846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a starter motor, an engine having an output mechanically coupled to the starter motor, a transmission having an input, and an electric machine mechanically coupled to the transmission input. The vehicle further includes a clutch configured to mechanically couple the electric machine and the output of the engine, and at least one controller. The at least one controller is programmed to initiate an engine start based on driver demand. The controller is further configured to enable pressure to the clutch for the engine start if driver demand is less than a calibratable torque value or enable the starter motor for the engine start if the driver demand is greater than a calibratable torque value. The controller may lock the clutch to the output of the engine in response to the speed of the engine being approximately equal to the speed of the electric machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FORD GLOBAL TECHNOLOGIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johri, Rajit Ann Arbor, US 166 2364
Kuang, Ming Lang Canton, US 179 2569
Liang, Wei Farmington Hills, US 171 1279
McGee, Ryan Abraham Ann Arbor, US 87 1742
Wang, Xiaoyong Novi, US 177 1278
Yamazaki, Mark Steven Canton, US 137 1177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00