Production method of deformed porous hollow fiber membrane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821501
APP PUB NO 20150174809A1
SERIAL NO

14602368

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of producing a deformed porous hollow fiber membrane by thermally induced phase separation, particularly by discharging a fusion kneaded product containing a thermoplastic resin and an organic liquid through an orifice of a hollow fiber-forming deformed nozzle; cooling and solidifying the fusion kneaded product discharged through the deformed nozzle to form the product into a hollow fiber-like material having a deformed cross section at a cross section vertical to a discharging direction; and extracting away the organic liquid from the hollow fiber-like material to obtain the deformed porous hollow fiber membrane, wherein an inorganic fine powder is kneaded in the fusion kneaded product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASAHI KASEI CHEMICALS CORPORATION1-105 KANDA JINBOCHO CHIYODA-KU TOKYO 101-8101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimura, Hirokazu Tokyo, JP 10 37
Hashino, Masatoshi Tokyo, JP 9 47
Kubota, Noboru Tokyo, JP 15 141
Matsuyama, Hideto Hyogo, JP 48 641

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00