Refractory material and casting nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821371
APP PUB NO 20160297003A1
SERIAL NO

14777909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refractory material contains: 40 mass % or more of MgO; 4 to 30 mass % of a free carbon component; and one or more of B2O3, P2O5, SiO2 and TiO2, in a total amount of 0.3 to 3 mass %, with the remainder being at least one other type of additional refractory component. A void layer exists in an interface between a carbon-containing matrix microstructure residing at least on opposite sides of a maximum-size one of a plurality of MgO-containing particles in the refractory material, and the maximum-size MgO-containing particle. A sum of respective thicknesses of the void layer at two positions on the opposite sides is 0.2 to 3.0% of a ratio with respect to particle size of the maximum-size MgO-containing particle. An inorganic compound of MgO and the one or more of B2O3, P2O5, SiO2 and TiO2 exists entirety or partially in a surface of each of the MgO-containing particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KROSAKIHARIMA CORPORATION1-1 HIGASHIHAMA-MACHI YAHATANISHI-KU KITAKYUSHU-SHI FUKUOKA 8068586 ?8068586

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Ling Fukuoka, JP 545 2275
Makino, Taro Fukuoka, JP 3 3
Morikawa, Katsumi Fukuoka, JP 29 94
Sasaki, Akinari Fukuoka, JP 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00