Automatic control element with uniformly-distributed stepping frequency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821331
SERIAL NO

14419158

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automatic control element has a sprinkler, a fluidic element connected to the sprinkler, and an outlet cover plate secured onto an outlet of the fluidic element. The fluid element further has a water inlet and a first air supply pore are symmetrically arranged on it. A second air supply pore is on the water inlet. A water distributor is formed on the sprinkler, a water tank is provided on the outer side of the sprinkler, and the water distributor is in communication with an inner cavity of the water tank. A signal nozzle is provided on the wall of the water tank, and the signal nozzle is connected to the water inlet via a conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGSU UNIVERSITYZHENJIANG CITY JIANGSU PROVINCE 212013 JINGKOU DISTRICT ROAD NO 301 ZHENJIANG CITY JIANGSU PROVINCE 212013

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, Jianyuan Jiangsu, CN 1 0
Li, Hong Jiangsu, CN 703 10114
Liu, Junping Jiangsu, CN 10 2
Liu, Xingfa Jiangsu, CN 4 5
Yuan, Shouqi Jiangsu, CN 18 8
Zhu, Xingye Jiangsu, CN 11 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00