Toy building set

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821245
SERIAL NO

14394706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toy building set comprising at least two toy building elements of which the one toy building element is provided with one or more coupling means of first type, and the second toy building element is provided with one or more coupling means of second type that is/are configured to be complementary to said coupling means of first type to the effect that they can be interconnected to form a structure, wherein the second toy building element comprises a flywheel (10) which is rotatably mounted on the toy building element, wherein the flywheel comprises one or more actuator mechanisms (21); and wherein the coupling means and the complementarily configured coupling means are configured such that the second toy building element can be mounted on the first toy building element in two or more different positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEGO A/SBILLUND

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frederiksen, Per Grindsted, DK 1 9
Larsen, Allan Westermann Hillerød, DK 1 9
Legernes, Erik Vejle, DK 3 24
Nielsen, Klaus Elias Billund, DK 2 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00