Concealed sprinkler head cover adjusting device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9821182
SERIAL NO

14741448

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concealed sprinkler head cover adjusting device includes a valve body formed with a flow channel therein. Both sides of the valve body are formed with an opposing bar along the axial direction of the flow channel. A shell is clamped on the opposing bars and is formed with a first accommodating space. A bottom cover is fixed to the bottom of the shell and is inwardly concaved formed a second accommodating space. A restriction site is formed on the outer wall of the opposing bars along the axial direction of the flow channel, both sides of the shell are symmetrically formed with a guiding part and a plurality of clamping parts, and the guiding parts guide the opposing bars to allow the clamping parts adjust the clamping position on the restriction site, thereby adjusting the position of the valve body in the first and second accommodating spaces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROTECTOR SAFETY IND LTDNO 3 ALLEY 16 LAN 228 NANKAN RD SEC 2 LUZHU TOWNSHIP TAOYUAN COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jung-Wen Taoyuan County, TW 11 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00