Online uninterruptible power supply topology

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819221
SERIAL NO

14429380

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An uninterruptible power supply (UPS) includes a rectifier circuit coupled to an AC input and configured to produce a DC voltage between first and second DC buses, an inverter circuit coupled to the first and second DC buses and configured to produce an AC voltage at the AC output. The UPS further includes an auxiliary power circuit comprising third and fourth DC buses configured to be coupled to a DC power source and third and fourth capacitors coupled between respective ones of the third and fourth DC buses and the neutral and respective first and second switches configured to couple and decouple respective ones of the third and fourth DC buses to and from respective ones of the first and second DC buses. The third and fourth capacitors may have capacitances greater than capacitances of the first and second capacitors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDDUBLIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Yilei Shenzhen, CN 28 396
Li, Yuehui Shenzhen, CN 15 52
Yang, Yuefeng Shenzhen, CN 19 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00