Solid electrolyte high energy battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819053
SERIAL NO

13861170

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a battery including a solid ionically conductive polymer electrolyte having a first surface and a second surface; a first electrode disposed on the first surface of the solid ionically conductive polymer electrolyte; a second electrode disposed on the second surface of the solid ionically conductive polymer electrolyte; and at least a first conductive terminal and a second conductive terminal, each terminal being in electrical contact with respectively the first conductive electrode and the second conductive electrode. The invention is also directed to a material including a polymer; a dopant; and at least one compound including an ion source; wherein a liberation of a plurality of ions from the ion source provides a conduction mechanism to form an ionically conductive polymer material. The present invention is further directed to methods for making such batteries and materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IONIC MATERIALS INC10-M COMMERCE WAY WOBURN MA 01801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zimmerman, Michael A North Andover, US 48 836

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00