System and method for hydrogen-based energy source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819043
SERIAL NO

12069699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system is disclosed that comprises a fuel cell unit operable to store at least one of water and hydrogen. At least one membrane is provided at one or more ends of the fuel cell unit. The membrane is operable to enable a flow of oxygen through the at least a portion of fuel cell unit. Further, the membrane is further operable to prevent water from flowing through at least a portion of the fuel cell. Moreover, an electrical source in operative engagement with the fuel cell unit. The fuel cell operates in a first mode to collect the hydrogen when receiving voltage from the electrical source, and further the fuel cell operates in a second mode to generate electricity using the hydrogen. The fuel cell unit is preferably stackable via a combination of conductible studs and receptacles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TWISTED SUN INNOVATIONS INC38 W 315 HERITAGE OAKS DRIVE ST CHARLES IL 60175

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kernene, Nicolas St. Charles, US 14 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00