Modular fuel cell and fuel source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9819033
SERIAL NO

14784905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell power module is coupled to a fuel supply reactor module by way of an adaptor which includes some of the control elements for controlling reaction of reactants in the reactor module. The adaptor includes a housing and a first connection interface in the housing for detachably coupling the adaptor to a fuel cell power module fuel inlet port and a second connection interface in the housing for detachably coupling the adaptor to a reactor module fuel outlet port. A fluid line extends between the first connection interface and the second connection interface. The adaptor includes a motive unit of a flow control mechanism configured to provide motive power to a flow circuit of a reactor module when the reactor module is coupled to the adaptor. The adaptor enables a fuel cell power module to be interfaced with different types of reactor modules having different form factor and different control requirements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTELLIGENT ENERGY LIMITEDBECKENHAM KENT BR3 4TU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carnall, Andrew John Loughborough, GB 1 1
Kells, Ashley James Loughborough, GB 5 11
Nicholas, Simon Loughborough, GB 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00