Singulation method for semiconductor package with plating on side of connectors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9818676
APP PUB NO 20160240460A1
SERIAL NO

15139257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of singulating semiconductor packages, the method comprising: providing a plurality of semiconductor dies coupled to a single common leadframe, wherein a molding compound at least partially encases the semiconductor dies and the leadframe; singulating the plurality of semiconductor dies, wherein the leadframe is at least partially cut between adjacent semiconductor dies, thereby forming exposed side surfaces on leads of the leadframe; and plating the exposed side surfaces of the leads with a plating material, wherein the plating material is a different material than the leads. In some embodiments, singulating the plurality of semiconductor dies comprises performing a full cut of the leadframe. In some embodiments, singulating the plurality of semiconductor dies comprises performing separate partial cuts of the leadframe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTAC HEADQUARTERS PTE LTD22 ANG MO KIO INDUSTRIAL PARK 2 SINGAPORE 569506

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nondhasitthichai, Somchai Bangkok, TH 36 383
Sirinorakul, Saravuth Bangkok, TH 79 565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00