Multi-grid method and apparatus using V cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9818167
SERIAL NO

14846069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-grid method using a V cycle includes: obtaining a first intermediate solution and a first residual by smoothing a cell of a fine level; obtaining a cell of a coarse level by down-sampling the cell of the fine level and setting the first residual as a second residual of the cell of the coarse level; obtaining a high-frequency component solution of the cell of the fine level and obtaining a smoothed high-frequency component solution by smoothing the high-frequency component solution; obtaining a coarse solution in the cell of the coarse level; up-sampling and transferring the coarse solution to the cell of the fine level and obtaining a corrected intermediate solution by adding the first intermediate solution, the smoothed high-frequency component solution and the coarse solution; and obtaining a second intermediate solution by smoothing the corrected intermediate solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DONGGUK UNIVERSITY INDUSTRY-ACADEMIC COOPERATION FOUNDATIONSEOUL 04620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Jeong Mo Seoul, KR 1 0
Jung, Hwi Ryong Gumi-si, KR 1 0
Kim, Sun Tae Seoul, KR 10 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00