Mask manufacturing equipment and mask manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9817318
APP PUB NO 20150268562A1
SERIAL NO

14645842

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an embodiment, mask manufacturing equipment includes a detector, an irradiator, a calculator, and a controller. The detector detects positional deviation of a pattern formed on a mask substrate. The irradiator irradiates the mask substrate with laser light to form a heterogeneous layer that is expanded in volume in the mask substrate. The calculator calculates an area periphery irradiation condition under which the irradiator is caused to emit laser light to a peripheral area of the pattern on the basis of the positional deviation detected by the detector so that the pattern area is reduced by forming the heterogeneous layer in the peripheral area of the pattern. The controller controls the irradiator to form the heterogeneous layer in the peripheral area of the pattern according to the area periphery irradiation condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIOXIA CORPORATION1-21 SHIBAURA 3-CHOME MINATO-KU TOKYO 108-0023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuhara, Kazuya Suginami, JP 90 452
Kugimiya, Tetsuya Kawasaki, JP 22 55
Sato, Hidenori Yokohama, JP 115 1210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00