Conversion of biomass, organic waste and carbon dioxide into synthetic hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9816035
SERIAL NO

14978893

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and system for producing a synthetic hydrocarbon having a desired H/C ratio is disclosed. Organic material is biochemically digested in a two stage biodigester for separately producing a hydrogen containing biogas substantially free of methane in a first stage and a methane containing biogas in a second stage. The methane containing biogas is reformed in a first reformer to generate hydrogen gas and carbon monoxide gas, which are then combined in a mixer with the hydrogen containing biogas into a syngas in amounts to achieve in the syngas an overall H/C ratio substantially equal to the desired H/C ratio. The syngas is reacted with a catalyst in a second reformer, a Fischer-Tropsch (FT) reactor, to produce the hydrocarbon. Using a two stage biodigester allows for the generation of separate hydrogen and methane streams, a more economical generation of the FT syngas and reduced fouling of the FT catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
D SALT & ASSOCIATES LTD69 WANITA ROAD MISSISSAUGA L5G 1B5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hafez, Hisham Mohamed London, CA 11 30
Lehoux, Richard Romeo Windsor, CA 15 86
Salt, Dave Mississauga, CA 5 22
Sehdev, Ranjit Markham, CA 3 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00