Polyisocyanurate based cement for wellbore fluid loss prevention

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815739
SERIAL NO

14928108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage
Patent Longevity
Forward Citations

Abstract

See full text

The present invention provides an oil or gas wellbore polymeric cement comprising the reaction product of an aliphatic isocyanate, a trimerization catalyst, and a catalyst retarder, wherein the reaction occurs in the wellbore at a temperature of at least 250° F. (121° C.). Also provided is a method of reducing fluid loss from an oil or gas well, comprising producing a polyisocyanurate cement by combining an aliphatic isocyanate, a trimerization catalyst, and a catalyst retarder within a wellbore at a temperature of at least 250° F. (121° C.). The various embodiments of the invention meet the controllability and minimized toxicity needed for this application. Standard aliphatic polyisocyanates reduce handling concerns while providing the reactivity response that fits this temperature range.

First Claim

See full text

Other Claims data not available

Family

PCTEP
+
−
  • No Family data available.

Patent Owner(s)

Patent OwnerAddress
COVESTRO LLC1 COVESTRO CIRCLE PITTSBURGH PA 15205

International Classification(s)

loading....
  • 2015 Application Filing Year
  • C09K Class
  • 2848 Applications Filed
  • 2073 Patents Issued To-Date
  • 72.79 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201520162017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeffries, Michael K Follansbee, US 22 183
Zielinski, David P Wexford, US 27 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • C09K Class
  • 24.18 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges228601831483221101 - 1011 - 2021 - 3031 - 4041 - 5051 - 6061 - 7091 - 100100 +050100150200250300350400450500550600650

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029