Power control method for fiber laser processing machine, and fiber laser processing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815140
SERIAL NO

14767070

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a power control method for a fiber laser processing machine including: a fiber laser oscillator having a plurality of fiber laser modules each of which generates a laser beam; a laser processing head for emitting the laser beam generated from the fiber laser oscillator; and a condenser lens with a prescribed focal length provided between a workpiece and the laser processing head, for irradiating the workpiece with the laser beam having a spot diameter output from the laser processing head, wherein the number of the plurality of fiber laser modules oscillated is adjusted so as to achieve the spot diameter corresponding to the workpiece, and thereby, a beam quality from the laser processing head is adjusted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU INDUSTRIES CORPORATION1-1 SHIN-MACHI ONO-MACHI KANAZAWA-SHI ISHIKAWA 920-0225

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Seiichi Komatsu, JP 45 486

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00