Inclined conveyor for combine harvesters with negative pressure inlet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9814182
SERIAL NO

14549111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inclined conveyor for a combine harvester has two drive elements which define a conveying direction and revolve in a conveying duct. Conveying duct is divided into an overshot return duct and an undershot conveying duct by a separating element situated between the upper run and the lower run of the drive element. Drive element is interconnected by carriers situated transversely with respect to conveying direction that convey harvested crop in undershot conveying duct. The difference in speed between the carrier bars and harvested crop stream is eliminated, and at least reduced, by additional acceleration of harvested crop stream. Carrier bars serve as carriers, and as acceleration elements for the harvested crop. That is because the cross section of each of the carrier bars viewed in conveying direction, occupies at least 30% of the smallest internal cross section of undershot conveying duct.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARNOLD JAGER HOLDING GMBHLOHWEG 1 HANNOVER 30559

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jäger, Sebastian Hannover, DE 25 85
Mulder, Jan-Harm Dalen, NL 4 35
Oord, Johan Groningen, NL 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00