Modular data center deployment method and system for data center vessels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9814163
SERIAL NO

15256579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular data center build method and system including prefabricated data center modules comprised of a plurality of racks, a plurality of rack-mounted computer systems, a door, electrical systems, cooling systems, power connections, water connections, video systems, biometric access system and a fire safety system. A steel beam structure may be employed to secure multiple vertical levels of a plurality of data center modules. The described modular data center build method and system with prefabricated data center modules may be employed to quickly deploy a data center in a repeatable sustainable manner, drastically reducing the build deployment time of a data center from design to fully operational.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAUTILUS TRUE LLC6101 BOLLINGER CANYON RD SUITE 302 SAN RAMON CA 94583

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kekai, Daniel San Ramon, US 14 63
Magcale, Arnold C San Ramon, US 13 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00