Insulating structure for power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812991
SERIAL NO

15106947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Due to increase of demand for safety of device, reinforcement of insulation of exposed conductive parts is required also in power conversion device. Relay unit having optical transmission unit, signal processing unit and power generating unit is provided between control circuit unit and gate drive circuit unit which form control device for an inverter. A gate signal generated in the control circuit unit is inputted into the signal processing unit of the relay unit through the optical transmission unit, and is outputted to the gate drive circuit unit from the signal processing unit through the optical transmission unit. Further, AC power is supplied to the power generating unit of the relay unit from a control device low-voltage AC power source through high-withstand voltage transformer. AC power is supplied to the gate drive circuit unit from the power generating unit of the relay unit through high-withstand voltage transformer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEIDENSHA CORPORATION1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6029

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morita, Kazunori Mishima, JP 11 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00