Resonant load power conversion device and time division operation method for resonant load power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812943
SERIAL NO

15318796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resonant load power conversion apparatus is provided to lower a switching frequency of each switching device and to reduce the number of main circuit conductors. The conversion apparatus includes a single-phase inverter having a dc input side (Vdc) connected with a dc voltage source and an output side (Vout) connected with a resonant load and outputting a rectangular wave voltage with a resonance frequency. Upper and lower arms on the input side and output side of the single-phase inverter are connected, respective, with switch group circuits 100U, 100V, 100V and 100V each of which includes N series combinations (N is an integer equal to or greater than 2) of two switching devices, connected in parallel with each other by main circuit conductors. The switching devices of the switch group circuits are controlled in a time division switching control mode with a control section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEIDENSHA CORPORATION1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6029

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Yasuhiro Numazu, JP 133 968

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00