Inverter-integrated electrically driven compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812919
SERIAL NO

14410458

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The purpose is to provide an inverter-integrated electrically driven compressor by which the danger of contacting an inverter device while power is being applied can be overcome in a reliable manner, without the need to provide any extra components, such as safety devices or the like. In this inverter-integrated electrically driven compressor, the inverter device is arranged housed within an inverter housing part hermetically sealed by a cover, and power and communication lines from an external power supply and a control device are connectable to the inverter device through connectors. The connector on the compressor side is furnished to the cover side, and at least one bolt of a fastening means for fastening the cover to the inverter housing part is furnished at location covered by the connector on the power line side, making access impossible, when the connector on the power line side has been coupled to the connector on the compressor side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS LTDSANTINGMU NO 2 FAN NO 3 TAKESHITA PILLS THE CAPITAL OF TOKYO JAPAN TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arashi, Noriaki Tokyo, JP 7 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00