Virtual channel abstraction layer for solid state power controls

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812873
SERIAL NO

14556591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-channel power controller includes a main controller communicatively coupled to a plurality of standard power control circuit boards. Each of the standard power controller circuit boards includes a nexus having a plurality of virtual channels and a plurality of solid state power controllers. Each of the solid state power controllers is controlled by one of the virtual channels. A plurality of physical control channels operable to control power to at least one load. Each physical control channel of the plurality of physical control channels is controlled by a corresponding solid state power controller of the plurality of solid state power controllers. At least one of the virtual channels controls more than one of the physical control channels in the plurality of physical control channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON SUNDSTRAND CORPORATIONFOUR COLISEUM CENTRE 2730 WEST TYVOLA ROAD CHARLOTTE NC 28217-4578

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dickey, John A Caledonia, US 62 343
Fritz, Kevin Case Rockford, US 4 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00