Energy storage system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812866
SERIAL NO

14626181

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for controlling power flow to and from an energy storage system are provided. One energy storage system includes an energy storage device and a bidirectional inverter configured to control a flow of power into or out of the energy storage device. The energy storage system further includes a controller configured to control the bidirectional inverter based on one or more signals received from the generator set coupled to the inverter via an AC bus. The controller is configured to, based on the one or more signals, control the bidirectional inverter to store power generated by the generator set in the energy storage device and transmit power from the energy storage device to a load driven by the generator set to maintain the generator set within a range of one or more operating conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS POWER GENERATION IP INC1400 73RD AVENUE NE MINNEAPOLIS MN 55432

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayana, Elias M Minneapolis, US 10 85
Hunt, Michelle Minneapolis, US 7 73
Palmer, Bradford K Ham Lake, US 25 283

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00