Battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812738
SERIAL NO

14980257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a battery comprising a cathode, an anode and an electrolyte; the cathode comprises a cathode material, the cathode material comprises a cathode active material which is capable of reversibly intercalating and deintercalating a first metal ions; the electrolyte comprises at least a solvent capable of dissolving solute, the solute being ionized to a second metal ions that can be reduced to a metallic state during a charge cycle and be oxidized from the metallic state to the second metal ions during a discharge cycle and the first metal ions that can deintercalate from the cathode active material during the charge cycle and intercalate into the cathode active material during the discharge cycle; and the anode and/or the electrolyte further comprise an additive which is a bismuth compound. The gas production amount could be effectively reduced when the battery is being used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHEN, PU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Pu Waterloo, CA 68 310
Liu, Yang Waterloo, CA 1941 7962
Yan, Jing Nanjing, CN 44 209

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00