Semiconductor structure with multiple transistors having various threshold voltages

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812550
SERIAL NO

15419315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor structure includes first, second, and third transistor elements each having a first screening region concurrently formed therein. A second screening region is formed in the second and third transistor elements such that there is at least one characteristic of the screening region in the second transistor element that is different than the second screening region in the third transistor element. Different characteristics include doping concentration and depth of implant. In addition, a different characteristic may be achieved by concurrently implanting the second screening region in the second and third transistor element followed by implanting an additional dopant into the second screening region of the third transistor element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIE FUJITSU SEMICONDUCTOR LIMITED130 D KNOWLES DRIVE LOS GATOS CA 95032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bakhishev, Teymur San Jose, US 29 345
Duane, Michael San Carlos, US 37 304
Gregory, Paul E Palo Alto, US 22 259
Hoffmann, Thomas Los Gatos, US 144 1468
Ranade, Pushkar Los Gatos, US 126 1886
Scudder, Lance Sunnyvale, US 29 778
Shifren, Lucian San Jose, US 139 2262
Sridharan, U C San Jose, US 5 10
Zhao, Dalong San Jose, US 27 584

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00