Systems and methods for producing flat surfaces in interconnect structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812360
SERIAL NO

15391393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In interconnect fabrication (e.g. a damascene process), a conductive layer is formed over a substrate with holes, and is polished to provide interconnect features in the holes. To prevent erosion/dishing of the conductive layer at the holes, the conductive layer is covered by a sacrificial layer (possibly conformal) before polishing; then both layers are polished. Initially, before polishing, the conductive layer and the sacrificial layer are recessed over the holes, but the sacrificial layer is polished at a lower rate to result in a protrusion of the conductive layer at a location of each hole. The polishing can continue to remove the protrusions and provide a planar surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TESSERA INC3099 ORCHARD DRIVE SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mohammed, Ilyas Santa Clara, US 319 8544
Oganesian, Vage Palo Alto, US 149 6013
Uzoh, Cyprian San Jose, US 61 1077

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00