Method for the construction of a secure nuclear reactor plant, and corresponding reactor plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9812227
SERIAL NO

14130360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method for building a nuclear reactor installation including a containment chamber surrounded by a protective casing. The method is characterised by the following essential construction phases: finding or preparing a cavern (2) in rocky ground or a mountain (3) which is connected to the outside world via a tunnel or shaft (4), constructing or introducing a sealed protective casing (5) made of steel which delimits the containment chamber (1) forming an enveloping intermediate chamber volume (6) between the protective casing (5) and the cavern walls (2′), and, filling the intermediate chamber (6) with concrete or cement (6′), with the exception of the tunnel or shaft (4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RUMP BJÖRN SIGURDNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rump, Björn Sigurd Vandoeuvres, CH 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00