Industrial machine having a power control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9811144
APP PUB NO 20160246357A1
SERIAL NO

14630756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a first industrial machine and a second industrial machine. The system also includes a power distribution system configured to provide power to the first industrial machine and the second industrial machine. The first industrial machine includes a first power control system configured to monitor power usage of the first industrial machine, and transmit power usage information of the first industrial machine to the second industrial machine. The second industrial machine includes a second power control system configured to monitor power usage of the second industrial machine, receive the power usage information from the first industrial machine, and control power usage of the second industrial machine based on the power usage information received from the first industrial machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOY GLOBAL SURFACE MINING INC4400 W NATIONAL AVENUE MILWAUKEE WI 53214

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Taylor, Wesley P Glendale, US 34 356

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00