Connector assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9810867
APP PUB NO 20160246021A1
SERIAL NO

15026422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In accordance with one embodiment, a connector assembly, for instance a connector assembly for an optical waveguide, includes a dielectric connector housing including a housing body that defines a mating end configured to mate with a complementary connector along a mating direction. The connector assembly further includes at least one latch arm supported by the housing body. The at least one latch arm can define outer surface and an opposed inner surface that faces an outer surface of the housing body. The connector assembly further includes an unlocking element supported by the housing body. The unlocking element can define an inner surface that faces the outer surface of the at least one latch arm. Movement of the unlocking element from a first position to a second position can cause the at least latch arm to deflect from a locked position to an unlocked position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FCI ASIA PTE LTDSINGAPORE SINGAPORE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Bruijn Jeroen Loop on Zand, NL 20 151
Otte, Sven Berlin, DE 12 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00