Arc-fault and ground fault interrupter using a single ground fault sensor and single ADC

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9810741
SERIAL NO

14911685

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Sampling for arc-fault detection, ground-fault detection, and grounded-neutral fault detection uses a single analog-to-digital converter (ADC). The arc-fault and ground-fault sampling occurs at regular sampling periods that are relatively short com pared to the time between them, thus allowing grounded-neutral fault sampling to occur before and/or after one of these sampling periods. A predefined event may be used to ensure the grounded-neutral fault sampling occurs immediately before and/or after one of the periodic sampling periods. The predefined event may be the expiration of a timer or the time for a sinusoidal signal in a ground fault sense circuit to make a predefined number of zero-crossings. This avoids interference between the arc-fault sampling, the ground-fault sampling and grounded-neutral fault sampling, allowing a single ADC to perform all samplings concurrently. The timing of the predefined event may be periodically reset to compensate for any changes due to temperature and/or over time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC USA INC1415 SOUTH ROSELLE ROAD PALATINE IL 60067

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dramé, Issa Vignon West Allis, US 1 8
Gass, Randall James Cedar Rapids, US 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00