Multipurpose bracket assembly for archery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9810504
SERIAL NO

14212138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bracket assembly for adjusting the elevation of a bowsight includes a first bracket portion and a second bracket portion spaced from the first bracket portion and adapted for connection to a bowsight. A first pivot arm extends between the first and second bracket portions and is connected thereto via first and second pivot joint assemblies, respectively. A second pivot arm extends between the first and second bracket portions and is connected thereto via third and fourth pivot joint assemblies, respectively. A range adjustment assembly is operably associated with one of the pivot arms and the first bracket portion to thereby cause pivoting movement of the first and second pivot arms and thus movement of the second bracket portion with respect to the first bracket portion to thereby adjust the elevation of a bowsight when connected to the second bracket portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOOD SPORTSMAN MARKETING L L C5250 FRYE ROAD IRVING TX 75061

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coalson, Damon Dallas, US 8 25
Estridge, John Plano, US 27 200
LoRocco, Paul Dallas, US 29 506
Webb, Greg Garland, US 9 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00