Process to obtain a compressed gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9810149
SERIAL NO

14378205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a process to obtain a compressed gas starting from a starting gas having a lower pressure by performing the following steps: (i) increasing the pressure and temperature of a gas having an intermediate pressure by means of indirect heat exchange against a fluid having a higher temperature to obtain a gas high in pressure and temperature, (ii) obtaining part of the gas high in temperature and pressure as the compressed gas, (iii) using another part of the gas high in temperature and pressure as a driving gas to increase the pressure of the starting gas in one or more stages to obtain the gas having an intermediate pressure for use in step (i). The invention is also directed to a configuration wherein the process can be performed and directed to a process to generate energy using the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ICE INDUSTRIAL PROPERTIES BV2153 GC NIEUW-VENNEP

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoogland, Johannes Arjen Hoofddorp, NL 3 1
Kruijer, George Johannes Hoofddorp, NL 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00