Methods for top-down fabrication of wafer scale TMDC monolayers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809903
APP PUB NO 20170253996A1
SERIAL NO

15061696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a TMDC monolayer comprises providing a multi-layer transition metal dichalcogenide (TMDC) film. The multi-layer TMDC film comprises a plurality of layers of the TMDC. The multi-layer TMDC film is positioned on a conducting substrate. The conducting substrate is contacted with an electrolyte solution. A predetermined electrode potential is applied on the conducting substrate and the TMDC monolayer for a predetermined time. A portion of the plurality of layers of the TMDC included in the multi-layer TMDC film is removed by application of the predetermined electrode potential, thereby leaving a TMDC monolayer film positioned on the conducting substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UCHICAGO ARGONNE LLC5801 SOUTH ELLIS AVENUE CHICAGO IL 60637

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antonio, Mark Naperville, US 3 24
Bera, Mrinal K Grenoble, FR 1 1
Das, Saptarshi State College, US 21 216
Roelofs, Andreas K Wheaton, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00