Door impact beam for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9809092
APP PUB NO 20170240030A1
SERIAL NO

15432466

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A door impact beam for a vehicle includes a beam main body 2 and an attaching portion 3 formed of first and second brackets 4 and 5, the first bracket 4 is coupled to the second bracket 5 by a coupling portion 20 to enable absorbing a relative movement due to difference in thermal expansion between the beam main body 2 and the components 6 of the vehicle door, a first locking hole 11 is bored in one of the first and second brackets 4 and 5 and a second locking hole 12 is bored in the other bracket, the first and second locking holes 11 and 12 are adapted to be locked by a temporarily fixing member 13 at a normal temperature and the temporarily fixing member 13 is adapted to be softened at a predetermined temperature or higher, and the second locking hole 12 includes an engaging hole 12a adapted to be engaged with the temporarily fixing member at a normal temperature and a slit 12b which is smaller in width than the maximum inner diameter of the engaging hole 12a.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANGO CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Toshiki Miyoshi, JP 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00