Method and apparatus for reinforcing a substrate or a fabric in a core structure of a component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9808995
SERIAL NO

13097963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for reinforcing a substrate or textile of a core structure of a component with the following method steps: a continuous semi-finished product is fed, via a feed means, into a cartridge of a conveying means which comprises a plurality of cartridges; the continuous semi-finished product is cut to length using a cutting means in order to produce a cut, reinforcing semi-finished product which is received in the cartridge; the cartridge is conveyed to a machining means; the cut, reinforcing semi-finished product is sharpened using the machining means; the cartridge is conveyed to a textile or substrate to be reinforced of a core structure; and the sharpened semi-finished product is shot into the textile or substrate of a core structure by a stud-shooting means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS OPERATIONS GMBHKREETSLAG 10 HAMBURG 21129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endres, Gregor Christian Pfaffenhofen, DE 29 154
Weber, Hans-Jurgen Verden, DE 7 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00