Polycrystalline abrasive compacts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9808911
APP PUB NO 20120180401A1
SERIAL NO

13428949

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing polycrystalline abrasive elements consisting of micron, sub-micron or nano-sized ultrahard abrasives dispersed in micron, sub-micron or nano-sized matrix materials. A plurality of ultrahard abrasive particles having vitreophilic surfaces are coated with a matrix precursor material in a refined colloidal process and then treated to render them suitable for sintering. The matrix precursor material can be converted to an oxide, nitride, carbide, oxynitride, oxycarbide, or carbonitride, or an elemental form thereof. The coated ultrahard abrasive particles are consolidated and sintered at a pressure and temperature at which they are crystallographically or thermodynamically stable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELEMENT SIX ABRASIVES SA9 RUE SAINTE ZITHE LUXEMBOURG L-2763
ELEMENT SIX (TRADE MARKS)SHANNON AIRPORT COUNTY CLARE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Can, Antionette Sunward Park, ZA 26 284
Davies, Geoffrey John Randburrg, ZA 54 598
Mochubele, Anna Emela Benoni, ZA 8 225
Myburgh, Johannes Lodewikus Helderkruin, ZA 13 310

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00