High density storage assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9807900
SERIAL NO

15007476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-density storage assembly having a casing, an engaging mechanism, and a recording medium machine; the casing has a receiving space, with a plurality of fixing portions disposed on a substrate at a bottom of the casing, the engaging mechanism has at least two supporting portions arranged in a side by side in a transverse width direction, each having a coupling portion and a supporting plate, with the coupling portions connected to the fixing portions of the substrate of the casing, respectively, and extended upward and obliquely to form the supporting plates. A containing space for movably placing and positioning the recording medium machine is formed between an abutting leaf spring and a limit plate which are disposed on a lower surface of the supporting plate of one of two adjacent said supporting portions and an upper surface of the supporting plate of another said supporting portion, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENBRO MICOM CO LTDNEW TAIPEI CITY 242

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Tseng-Hsun New Taipei, TW 3 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00