Intersection signaling method for bearer management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9807734
APP PUB NO 20130258941A1
SERIAL NO

13853737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Intersection signaling method for bearer management in a communication network with transporting bearer resource request message of both the UE and RN via Base station to managing entity of RN within EPC, as a signaling message over uplink channel referred to as ‘Union of Resource Request (UR Request)’ message. The bearer resource response message from one of the managing entity of UE or managing entities of UE and RN within EPC are transported as a signaling message to Evolved Packet Edge (EPE) via Base station over the downlink channel referred to as ‘Intersection of Admission Response (IA Response)’. This manages bearer setup signaling as a single loop, by transportation of ‘UR Request’ signaling message and receiving one “IA Response” signaling message over uplink and downlink channels respectively. EPE is a conglomeration of network nodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEJAS NETWORKS LTDPLOT NO 25 JP SOFTWARE PARK ELECTRONICS CITY PHASE-1 HOSUR ROAD BANGALORE 560100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rohit, Kumar Bangalore, IN 9 22
Sanil, R C Bangalore, IN 8 12
Vinod, Kumar M Bangalore, IN 8 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00