Current conversion device for a single- or multi-axis arrangement and operating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9806597
APP PUB NO 20150162816A1
SERIAL NO

14566438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

For operating multi-axis drive assemblies more reliably even in a field weakening range, a current conversion device is proposed which includes a voltage-source DC link, a plurality of inverters having each a DC input side connected to the voltage-source DC link and AC output-side terminals for connection to an electric motor, and a control device configured to short-circuit each of the inverters. A measurement device measures an electrical variable at each of the inverters. The control device determines based on the measured electrical variables independently for each of the inverters directly or indirectly whether a particular inverter is feeding energy into the voltage-source DC link, and short-circuits, when this is the case, the particular inverter independently of the other inverters. A corresponding operating method is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 80333 MÜNCHEN 80333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herrmann, Bernd Herzogenaurach, DE 50 263
Wiessmann, Harald Kirchheim, DE 7 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00