Non-volatile memory device and operating method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9805796
SERIAL NO

15436881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A non-volatile memory device includes a first floating gate unit, a second floating gate unit, a selecting gate unit and a comparator. The first floating gate unit is configured to generate a first current according to a first bit signal and a control electric potential. The second floating gate unit is connected with the first floating gate unit in parallel, and configured to generate a second current according to a second bit signal and the control electric potential. The selecting gate unit is connected to the first floating gate unit and the second floating gate unit, and configured to generate the control electric potential according to a source signal and a word signal. The comparator is electrically connected to the first floating gate unit and the second floating gate unit, and configured to compare the first current with the second current, so as to generate a data-stored state signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COPEE TECHNOLOGY COMPANY4F NO 94 LN 1050 MINGHU RD EAST DIST HSINCHU CITY 300

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
King, Ya-Chin Taipei, TW 91 428
Lin, Chrong-Jung Hsinchu, TW 91 719

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00