Screw compressor and chiller unit provided with same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803900
SERIAL NO

15297200

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A screw compressor and a chiller unit are provided. An oil separator of the screw compressor may include an outer cylinder, an inner cylinder positioned inside the outer cylinder, and an introducing flow path. The upper end of the inner cylinder is held by the oil separator and the outer wall of the inner cylinder is held independently of the inner wall of the outer cylinder. The diameter of the inner wall of the outer cylinder may gradually be reduced along the swirl flow path. The refrigerant via the introducing passage swirls and goes down along the swirl flow path and is separated into gas refrigerant and oil. The separated gas refrigerant flows from the lower end of the inner cylinder into the inner cylinder and goes up, and the separated oil flows down along the inner wall surface of the outer cylinder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JOHNSON CONTROLS-HITACHI AIR CONDITIONING TECHNOLOGY (HONG KONG) LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iizuka, Yasuaki Tokyo, JP 5 16
Kato, Eisuke Tokyo, JP 10 54
Kuriyama, Shu Tokyo, JP 2 2
Takebayashi, Masahiro Tokyo, JP 33 653
Yonemoto, Ryuichiro Tokyo, JP 7 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00