Joint structure for metallic pipes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803781
SERIAL NO

13996358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One of a first metallic pipe containing a first metal as a main component and a second metallic pipe containing a second metal as a main component includes an expanded-diameter connecting part which is formed at an end part of the one metallic pipe. An inner diameter of the end part is greater than an inner diameter of an adjacent part that is adjacent to the end part. An intermetallic compound layer of the first and second metal is present at an interface of the first and second metal located between a brazing filler metal and the one or the other of the metallic pipes. A thickness of the intermetallic compound layer is configured such that the thickness of an end portion on the side of a base end is smaller than the thickness of an end portion on the side of an open end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kido, Teruo Sakai, JP 8 29
Kikuno, Tomonori Sakai, JP 7 35
Yamashita, Hiroshi Sakai, JP 467 5965

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00