Reactor system and solid fuel composite therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803512
APP PUB NO 20160208659A1
SERIAL NO

15085113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor system includes a fluidized-bed. A fuel and a sulfur absorbent material are eluted through the fluidized-bed. The reactor system may include a heat exchanger having a heat-exchanging portion within a heating zone of the reactor that is hermetically sealed from the heating zone. The reactor may include loose particles of an inert bed material for forming the fluidized-bed. A feed system may be provided to inject a solid fuel composite that includes a mixture of a solid, carbonaceous fuel and a solid reagent into the reactor.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GAS TECHNOLOGY INSTITUTEDES PLAINES IL 60018

International Classification(s)

loading....
  • 2016 Application Filing Year
  • F01K Class
  • 333 Applications Filed
  • 253 Patents Issued To-Date
  • 75.98 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20162017201820192020202120220255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hartung, James A West Hills, US 3 66
Mays, Jeffrey A Woodland Hills, US 23 91
Stewart, Albert E Canoga Park, US 23 421
Subbaraman, Ganesan Bell Canyon, US 6 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • F01K Class
  • 0 % this patent is cited more than
  • 8 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges2051901 - 1011 - 2002.557.51012.51517.52022.52527.53032.53537.54042.54547.55052.555

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029