Power generation from waste heat in integrated crude oil hydrocracking and aromatics facilities

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803506
SERIAL NO

15087412

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system includes two heating fluid circuits coupled to multiple heat sources from multiple sub-units of a petrochemical refining system. The sub-units include an integrated hydrocracking plant and aromatics plant. A first subset and a second subset of the heat sources includes diesel hydro-treating plant heat exchangers coupled to streams in the diesel hydro-treating plant and aromatics plant heat exchangers coupled to streams in the aromatics plant, respectively. A power generation system includes an organic Rankine cycle (ORC) including a working fluid that is thermally coupled to the two heating fluid circuits to heat the working fluid, and an expander to generate electrical power from the heated working fluid. The system includes a control system to activate a set of control valves to selectively thermally couple each heating fluid circuit to at least a portion of the heat sources.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al, Saed Hani Mohammed Jubail Ind., SA 32 263
Bunaiyan, Ahmad Saleh Dhahran, SA 19 184
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00