Wellhead platform systems for use in extracting and testing multi-phase raw mixtures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803460
SERIAL NO

14912849

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Example embodiments include systems for use in a wellhead platform. The system may comprise a separator subsystem, a scrubber subsystem, a first stage compressor subsystem, and a second stage compressor subsystem. The separator subsystem may comprise a separator inlet section for receiving multi-phase raw mixtures, a separator container body for housing the received multi-phase raw mixture, and a separator gas outlet section for separating gas. The scrubber subsystem may comprise a scrubber inlet section connected to the separator gas outlet section, a scrubber container body, and a scrubber gas outlet section for separating gas. The first stage compressor subsystem may be operable to receive gas separated from the scrubber subsystem, compress the received gas, and output the compressed gas. The second stage compressor subsystem may be operable to receive compressed gas from the first stage compressor subsystem, further compress the received compressed gas, and output the further compressed gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PTT EXPLORATION AND PRODUCTION PUBLIC COMPANY LIMITED555/1 ENERGY COMPLEX BUILDING A 6TH 19TH-36TH FLOORS VIBHAVADI RANGSIT ROAD CHATUCHAK CHATUCHAK BANGKOK 10900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aroonsangob, Peeradet Bangkok, TH 1 2
Buntoengpesuchsakul, Chanwith Bangkok, TH 1 2
Kokanutranont, Choosak Bangkok, TH 1 2
Sillapacharn, Thitinun Bangkok, TH 1 2
Therdwikrant, Tanadcha Bangkok, TH 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00