Ladder support and movement assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803422
SERIAL NO

14965155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ladder support assembly including a base frame having first and second ends and a pair of pivot supports extending from the base frame which support a rod configured to pivotally support a ladder relative to the base frame. A pivot frame is pivotally mounted to the base frame and is biased away from the base frame. A bracket assembly is pivotally mounted to the pivot frame and includes a pair of bracket plates. Each bracket plate has an inner flange and outer flange with a ladder rail receiving area between the inner and outer flanges. The ladder receiving area is configured such that the bracket plate is slidable relative to a respective ladder rail received therein. A crank assembly includes a spool rotatably supported on the base frame and a cord wound about the spool with a free end of the cord connected relative to the pivot frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOHNSON ROBERT LNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Johnson, Robert L Harleysville, US 49 1067

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00